Plastic mouldings are often only part of a complete product, typically requiring assembly with other components and finishing touches to make them ready for market.
Cybertools have the flexibility to run a varied program of secondary operations, according to each projects specification. We assess and advise which post moulding processes and assembly options would be most advantageous for our customers to perform with us, in terms of time, cost and final product quality.
Our capacity includes machine operations, thread insertion and partnered Ultrasonic welding; through to pad printing, labelling and packaging. Facilities allow for assembly by hand or with automation and electronic component testing.
Performing post moulding operations with Cybertools reduces sub-contractor requirements, improving delivery schedules and simplifying your supply chain management.
EDM Wire Erosion
Cybertools wire erosion facility includes Sodicks latest VZ300L, offering flexible capacity that can accommodate work pieces up to a maximum of 780 × 570 × 215mm depending on geometry.
We ensure our customers specifications are maintained by utilising quality control procedures and tolerance optimisation, providing a surface finish of 0.20Ra and cut accuracy to within 3 microns.